Fees

Fees

  • Wetlands Permit Application: $1,250.00
  • Coastal Erosion Permit Application: $1,250.00 
  • Administrative Wetland Permit: $250.00
  • Permit As-Built Application: Double Application fees for all projects completed prior to obtaining appropriate permit. 
  • Preapplication site visit: $150.00 which may be applied to an application fee for a wetlands permit made within 6 months of the site visit and which application involves activities that were the subject of the site visit.
  • Permit Amendment Application: $100.00
  • Additional inspection fee: $50.00 per site visit, i.e. final inspection, silt fence inspection, etc.
  • One Year Extension Application: $100.00
  • Permit Transfer to New Owner Name Permit Application: $100.00
  • Annual Coastal Contractor License: $100.00
  • Fixed Dock/Ramp/Float Fees: $3.00 per sq. ft. 
  • Dredging fee: $10.00 per cubic yard
  • Pursuant to New York State law, all costs incurred by the Town for SEQRA review shall be paid by the applicant.

Consultant fee. The Board, at its discretion, depending on the scale and potential impact of proposed operations, is authorized to require the posting of a consultant fee by an applicant. This fee shall be used to hire an independent, expert consultant to investigate the site for the proposed project and to examine the plans or other information submitted by the applicant to assist the Board in evaluating potential adverse impacts upon a resource area by the proposed project. The Board, in its discretion, will determine whether the complexity of the activity, the difficulty in determining the threat to the resource areas or the size of the request or project involves and requires more information and analysis than can reasonably be supplied to the Board without independent technical professional assistance.

  • The Board may require the payment of the consultant fee at any time in the deliberations prior to a final decision.
  • The consultant fee may be required for expert opinion regarding, but not limited to, wetland resource area surveys and delineations, analysis of resource area values, wetland resource area reports, hydrological and drainage analysis, wildlife habitat analysis, shellfish surveys, and environmental land use law, or any of the following:
  • Placement, removal or grading of at least 50 cubic yards of material;
  • Five hundred square feet or greater alteration of a resource area;
  • Shoreline or bank alteration to a coastal or inland waterway;
  • Five hundred square feet or greater alteration to land in a naturally vegetated condition that constitutes a resource buffer area.
  • Discharge of any pollutants into or contributing to surface or groundwater of the resource area;
  • Construction of any stormwater control facility, or water control structure.
  • Duck Blind Application: $25.00
  • Duck Blind Annual Renewal Application: $50.00
  • Mooring or Stake & Pulley System Application: $50.00
  • Annual Mooring Renewal Application with vessels up to 19 ft: $500.00
  • Annual Mooring Renewal Application with vessels from 20 ft to 27 ft: $750.00
  • Annual Mooring Renewal Application with vessels from 28 tf to 35 ft: $1,000.00
  • Annual Stake & Pulley System Renewal Application for vessels up but no larger than 18ft: $150.00